Stock control
How do I set reorder points?
By the Ceazr team · Published · Reviewed
Short answer
A reorder point is the stock level at which you place a new order. The standard formula is reorder point = average daily demand × lead time in days + safety stock. Set one for each product at each location, because demand and lead times differ between branches, and review them regularly as sales change.
The reorder point formula
The idea is simple: order when the stock you have left will just cover what you sell while you wait for the next delivery, plus a buffer for surprises.
- Average daily demand: how many units you sell or use on a normal day. Divide the units sold over the last 30 or 90 days by the number of days: 300 units in 30 days is 10 a day. Work it out for each location, not for the business as a whole.
- Lead time: the number of days from placing an order to having the stock on the shelf. Include the time it takes you to raise the order and receive the goods, not just the supplier's delivery time. For imported goods, include customs clearance and the journey inland. Use what recent deliveries actually took, not the supplier's quoted time. See lead time.
- Safety stock: extra units held to cover busier days or late deliveries. See safety stock.
Reorder point = (average daily demand × lead time in days) + safety stock. The first part is your demand during lead time; the second is your buffer.
A simple way to set safety stock
There are several ways to calculate safety stock, from rough rules of thumb to statistical models. One common approach that needs only your own sales and delivery records is:
Safety stock = (maximum daily demand × maximum lead time) − (average daily demand × average lead time).
Use a recent, normal period for the maximums, such as the busiest ordinary day in the last few months and the slowest delivery you had. Leave out one-off events like a single bulk order, or the buffer will be far bigger than you need. If you need to cut stock tied up in a slow line, accept a smaller buffer; if running out costs you customers, keep a larger one.
If you don't have enough sales history yet, start with a rough buffer of two or three days' average demand, then switch to the formula once you have a few months of records. A rough buffer is better than none.
Worked example
| Product | Avg daily demand | Avg lead time | Max daily demand | Max lead time | Safety stock | Reorder point |
|---|---|---|---|---|---|---|
| Bottled water (case) | 20 | 5 days | 25 | 6 days | 150 − 100 = 50 | 100 + 50 = 150 |
| Rice 5 kg | 8 | 7 days | 12 | 9 days | 108 − 56 = 52 | 56 + 52 = 108 |
| Light bulbs | 3 | 10 days | 5 | 14 days | 70 − 30 = 40 | 30 + 40 = 70 |
Take bottled water: the shop sells about 20 cases a day and deliveries take about 5 days, so it sells around 100 cases while waiting. On its busiest normal days it sold 25, and the slowest delivery took 6 days, giving a worst case of 150. The 50-case gap is the safety stock, and the reorder point is 150 cases. When stock drops to 150, it orders.
Set reorder points per location
One reorder point for the whole business hides problems. A busy branch can run out while a quiet one sits on weeks of stock, and the combined total looks fine.
- Use each location's own demand. A product that sells 20 a day in one shop may sell 3 a day in another.
- Use each location's own lead time. A warehouse orders from a supplier; a branch may be restocked from the warehouse by transfer, which is often quicker.
- Set the warehouse to cover the branches it supplies, not just its own walk-in sales.
| Location | Avg daily demand | Lead time | Safety stock | Reorder point |
|---|---|---|---|---|
| Main warehouse | 80 | 7 days | 100 | 560 + 100 = 660 |
| Branch | 30 | 9 days (longer delivery route) | 50 | 270 + 50 = 320 |
Two different reorder points for the same product is correct. One shared figure would leave the branch ordering far too early or the warehouse far too late.
How often to review them
Reorder points go stale as sales and suppliers change. A practical habit is to review your fastest-moving and most important products monthly, and the rest every quarter. Review sooner when:
- A season, holiday or promotion is about to change demand.
- A supplier's delivery times get longer or less reliable.
- You keep running out of an item, or keep holding far too much of it.
- You open a new branch or change how branches are restocked.
To check your safety stock is right, note how much was left each time a delivery arrived. If you rarely touch the buffer, it may be bigger than you need. If you often dig deep into it, or run out before the delivery comes, it is too small, or the lead time you used is too short.
Items that never seem to reach their reorder point may be turning into dead stock.
How Ceazr handles reorder points
Questions people also ask
- What is the difference between a reorder point and safety stock?
- Safety stock is the buffer you keep for surprises. The reorder point is the level at which you order, and it includes the safety stock plus the stock you expect to sell during the lead time.
- Should every branch have the same reorder point?
- Usually not. Each branch has its own demand and often its own lead time, so each needs its own reorder point for each product.
- Does Ceazr calculate reorder points for me?
- You set the reorder point for each product at each location. Ceazr then alerts you before items run out, can raise requisitions automatically, and monitors how fast each SKU moves.
Try Ceazr free for 14 days. No card needed.